2 Bedroom Flat in Northern Athens
Status : Full renovation in progress, delivery date : December 2020
Description of works
Electrical Installation
New wiring infrastructure including structure cabling. installation of new sockets and switches (Data , TV, kitchen appliances, A/C). Instal-lation of kitchen ventilator (hood).
Hydraulic Fittings
New water pipes and sewage pipes infrastructure in kitchen and bathroom. Maintenance of heating radiators. Installation of new sanitary equipment and bathroom accessories. Installation of new water sink and tap.
Wood Work
Installation of new wooden closets in the bedrooms, installation of new kitchen and bathrooms furniture. Maintenance of internal doors.
Miscellaneous
- Installation of new aluminum window frames, of energy class A+, including bed-room shutters.
- Installation of new safety door.
- Installation of new laminate floor in living room, dining room, bedrooms and kitch-en.
- Installation of new tiles in the bathroom and the kitchen countertop.
- Installation of irrigation system in veranda.
Painting
Plaster corrections and full painting of ceilings and walls.
If this is of interest to you, contact greece@nwivisas.com TODAY!