2 Bedroom flat in Central Athens
Status : Full renovation in progress, delivery date : November 2020
Description of works
Electrical Installation
New wiring infrastructure including structure cabling. Infrastructure for the electrical shutters,
installation of new sockets and switches (Data , TV, kitchen appliances, A/C). Installation of kitchen electric appliances .
Hydraulic Fittings
New water pipes and sewage pipes infrastructure in kitchen and bathroom. Maintenance of heating radiators. Installation of new sanitary equipment and bathroom accessories. Installation of new water sink and tap.
Wood Work
Installation of new kitchen and bathrooms furniture.
Miscellaneous
- Installation of new aluminum window frames, of energy class A+, including bedroom shutters.
- Installation of new safety door.
- Installation of new laminate floor in entire area.
- Installation of new tiles in the bathroom and the kitchen countertop.
Painting
Plaster corrections and full painting of ceilings and walls.
If this is of interest to you, contact greece@nwivisas.com TODAY!